
Add to Cart
1084 Hot Rolled Galvanized Steel Flat Bar High Carbon Ms Flat Steel Q195/ Q235A-B/Q345A-E
Description
Product Name | Flat Steel |
Technique | Pre-galvanized / Hot-dipped galvanized / Hang-planting galvanization |
Steel grades | Q195, Q235A-B, Q345A-E, 20#, 10#,16Mn, ASTM A36,ASTM A500, ASTM A53, ASTM 106, SS400, St37, St52, S235JR, S355TRH ect. |
Standards | GB/T 3091-2001,GB/T13912-2002, BS 1387, ASTM F1083 ect. |
Application | liquid delivery (pump well, gas, water), construction pipe, structural pipe(greenhouse structure, fence post), curtain wall, machinery part ect. |
Package | in bundle, no other package or wrapped with waterproof, or as customers' requirement |
Delivery Time | 10days from stock; 15-20days produced according to the qty |
Grade | Chemical Composition | Mechanical Properties | ||||||
C | Mn | Si | S | P | Yield | Tensile | Elongati | |
Strength Mpa | Strenth Mpa | -on % | ||||||
Q195 | 0.06-0.12 | 0.25-0.50 | ≤0.30 | ≤0.045 | ≤0.05 | ≥195 | 315-430 | ≥33 |
Q215 | 0.09-0.15 | 0.25-0.55 | ≤0.30 | ≤0.05 | ≤0.045 | ≥215 | 335-450 | ≥27 |
Q235 | 0.12-0.20 | 0.30-0.67 | ≤0.30 | ≤0.045 | ≤0.04 | ≥235 | 375-500 | ≥26 |
Q345 | ≤0.20 | 1.00-1.60 | ≤0.55 | ≤0.04 | ≤0.04 | ≥345 | 470-630 | ≥22 |
Product Details
Product Application
Certifactes
Market
Packing & Shipping
Payment
FAQ
Q1: What is your terms of payment?
A: 30% T/T in advance,the balance 70% before delivery.We will show you the photos of products and package before you pay thebal- ance.
Q2: what is the terms of delivery?
A:EXWFOBCIFCFR.DDU
Q3: What is the terms of packing?
A: generally, we pack our goods in bundles or coils with rods or belts we could also pack the goods as the customersrequirement.
Q4: What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7 days after we received your deposit.
For production period it usually takes about 15 days-30 days after re ceiving the deposit.
Q5: Could you produce according to the samples?
A: Yes, we could customer-made by your samples or technique draw- ings, we could build the mold and fixtures.